Securafy Solutions — Managed Cloud Migration

Move to the Cloud.
Without the Chaos.

Securafy manages your complete migration to Microsoft Azure or cloud BCDR — end to end. Discovery, design, migration, cutover, documentation. You stay operational throughout. We deliver a cloud environment that's faster, more resilient, and compliance-ready from day one.

Schedule a Free Cloud Assessment → View Comply-CARE
Zero
Downtime Goal
4–12
Weeks Typical Timeline
100%
Documented Handoff
24/7
NOC Monitoring Post-Migration
Why Now

Your On-Premises Servers Are
Costing You More Than the Cloud.

Hardware refresh cycles, emergency replacements, physical security requirements, on-site maintenance, power and cooling costs, backup infrastructure — every dollar spent keeping servers in your building is a dollar not invested in your business.

Cloud isn't just cheaper long-term. It's more resilient, more scalable, easier to manage, and dramatically easier to protect. And when your IT is managed by Securafy, the cloud environment you move into is secured from the first day with the same Zero Trust, NIST-aligned architecture we apply to every client environment.

The question isn't whether to move to the cloud. It's whether you want to do it right.

$25K+
Avg server refresh cost every 5 years
99.99%
Azure SLA uptime guarantee
CapEx
Converted to predictable OpEx
Minutes
To spin up new capacity — not weeks
What We Migrate

If It Runs On-Premises,
We Can Move It.

Securafy has migrated every type of on-premises workload for SMBs and mid-market organizations. We don't hand you a cloud template — we design a migration plan around your specific applications, data, compliance requirements, and operational constraints.

🖥️
Infrastructure

Servers & VMs

Physical and virtual servers migrated to Azure VMs or Azure Virtual Desktop. Right-sized for your actual workload. Configured with Securafy's security baseline from day one.

📁
Data

File Shares & Databases

On-premises file servers, SQL databases, and Exchange migrated to Azure Files, Azure SQL, SharePoint, and Exchange Online. Integrity verified at every step.

⚙️
Applications

Line-of-Business Apps

ERP, practice management, CRM, and custom LOB applications assessed for cloud compatibility and migrated with full testing before cutover.

🔒
Identity

Active Directory

On-premises Active Directory migrated or hybrid-joined to Microsoft Entra ID (Azure AD). MFA enforced. Conditional Access policies applied at migration.

💾
Business Continuity

Cloud BCDR

On-premises backup appliances replaced with cloud BCDR (Datto Cloud). Defined RTO/RPO. Instant virtualization capability. Disaster recovery to cloud included.

📧
Productivity

Microsoft 365

On-premises Exchange, file shares, and legacy collaboration tools migrated to Microsoft 365 with zero mail-flow disruption and full historical data preserved.

The Process

Every Migration Follows
a Proven 5-Phase Plan.

No surprises. No "we'll figure it out." Every Securafy migration is planned in detail before a single workload moves. You approve the plan. We execute it.

Phase 1

Discovery & Assessment

Complete inventory of your servers, applications, data volumes, dependencies, and compliance requirements. We identify every workload, every dependency, and every risk before planning begins.

Phase 2

Architecture Design

Cloud architecture designed for your specific workloads. Sizing, networking, security baselines, backup configuration, and compliance controls all defined and documented. You review and approve before migration begins.

Phase 3

Phased Migration

Non-critical workloads migrate first. Critical systems last. Each workload is validated in the cloud environment before cutover. Rollback capability is maintained at every stage.

Phase 4

Cutover & Validation

DNS cutover coordinated during off-hours maintenance window. User access validated. Applications tested. Monitoring confirmed active. Securafy NOC on standby throughout cutover window.

Phase 5

Handoff & Ongoing Management

Complete documentation of your new cloud environment delivered. Securafy begins managing the cloud infrastructure under your existing service agreement — or onboards you as a new managed client.

Compliance-Aware by Default

Regulated Workloads
Need a Different Approach.

Most cloud migration vendors treat compliance as an afterthought. Securafy treats it as a prerequisite. We serve HIPAA, GLBA, CMMC, CJIS, and FFIEC-regulated organizations — and your cloud architecture is designed from the ground up to maintain your compliance posture through and after migration.

Post-migration compliance documentation is included in every regulated engagement — giving you evidence-ready artifacts for your next audit, examination, or insurance renewal.

HIPAA CMMC 2.0 GLBA / FFIEC CJIS NIST CSF 2.0 Ohio Safe Harbor PCI-DSS
BAA Execution

Business Associate Agreements executed before any PHI touches cloud infrastructure. Proper Azure HIPAA configuration applied at provisioning.

Encryption In-Transit & At-Rest

AES-256 encryption configured for all data at rest. TLS enforced for all data in transit. Key management documented and auditor-ready.

Audit Logging & Monitoring

Azure Monitor, Log Analytics, and Securafy SOC monitoring configured from day one. Compliance-required log retention policies applied automatically.

Common Questions

Cloud Migration —
Your Questions Answered

Discovery and assessment, architecture design, phased workload migration, application testing, DNS cutover, post-migration monitoring, and complete documentation. Securafy owns every phase. You stay operational throughout and approve the plan before migration begins.

Securafy specializes in Microsoft Azure, Microsoft 365, Azure Virtual Desktop, and cloud BCDR (Datto Cloud). We work exclusively in the Microsoft ecosystem, which means deep expertise, certified engineers, and architecture that integrates cleanly with the M365 tenants most of our clients already have.

Our methodology is designed for near-zero downtime. Most workloads are migrated with no user-visible interruption. Critical system cutovers are scheduled during off-hours maintenance windows — typically measured in minutes, not hours. Rollback capability is maintained at every stage so we can reverse course instantly if anything unexpected occurs.

A typical SMB migration (5–50 servers, under 10TB of data) takes 4–12 weeks from kickoff to final cutover. Larger or more complex environments are scoped individually during the discovery phase. We give you a firm timeline before you commit — no open-ended engagements.

Yes — and this is where Securafy is uniquely positioned. We serve HIPAA, GLBA, CMMC, CJIS, and FFIEC-regulated clients through our MSSP practice. Your cloud architecture is designed to maintain compliance through and after migration, with post-migration documentation included for your next audit or examination.

Free Cloud Assessment

Your Servers Won't
Last Forever.
The Cloud Will.

Schedule a complimentary cloud migration assessment. We'll inventory your current environment, identify your highest-priority migration candidates, and give you a clear picture of what a migration would cost, how long it would take, and what you'd save — no obligation, no pressure.

Book My Free Cloud Assessment → 📞 (330) 906-8888

★ Soteria Award — Most Trusted MSP in North America 2024  ·  Human Led. AI Driven. Prevention-First.™